http://www.prattfamily.demon.co.uk/mikep/gsmnet.html


GSM Base Station photos - Cellnet



Picture loading - please wait.
Stage 5 - October 1998 - The two Cellnet directional antennae providing omni-directional coverage have now been added. Two feed cables for each antenna (one for each polarisation presumably) have been run down the tower to the equipment cabin.

Looks like this base station is just awaiting a microwave link, with the dish to be installed on the attachment just above the left hand antenna.


Back to Installing New Base Stations Page
Back to GSM Photo Page

Mike Pratt - 5th November 1998

Return to UK GSM page