http://www.prattfamily.demon.co.uk/mikep/gsmnet.html
GSM Base Station photos - Cellnet
STAGE 2a: Next, a site is cleared and concrete foundation laid. Mains box and cable runner installed. The ground is slightly raised to show where the surrounding fencing should be placed.
Back to Installing New Base Stations Page
Back to GSM Photo Page
Mike Pratt - 30 September 1998
Return to UK GSM page