http://www.prattfamily.demon.co.uk/mikep/gsmnet.html


GSM Base Station photos - Cellnet



Picture loading - please wait.
STAGE 2a: Next, a site is cleared and concrete foundation laid. Mains box and cable runner installed. The ground is slightly raised to show where the surrounding fencing should be placed.


Back to Installing New Base Stations Page
Back to GSM Photo Page

Mike Pratt - 30 September 1998

Return to UK GSM page